JUNYUAN IMPORT & EXPORT CO.,LTD
|
Price: | 1.5 USD |
Payment Terms: | T/T,L/C,D/P,WU |
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Brass Water Meter Ball Valve with Female and Free Nut
Product Description :
High Quanlity Aluminum Handle Ball Valve Male End with Free Nut
Material: Forged Brass ( CW617N, CW614 ,CW602N,ASTM C37700)
Size: DN15 , DN20, D25mm
Thread standard: Free Nut according to ISO228, ISO7/1, DIN2999/DECA fittings
For the handle, it could be changed to magnetic Type, Brass Handle, or Zinc Alloy Handle
Package details: Each valve by one polybag, inner box, Cartons with pallets
Technical Specification:
Working pressure: 1.6Mpa
Tested Pressure: 2.0Mpa
Working medium: Water, oil, gas
Working temperature: -20° C≤ T≤ 120° C
Installation Instruction:
1 | Before Installing the valves, clean and remove any objests from the pipes | |||||||
2 | Ensure both connection pipes either side of valves and aligned | |||||||
3 | Ensure that two sections of the pipe match, and the valves until will not accept any | |||||||
gaps, any distroy in the pipes may affect the tighting of the connection, The work | ||||||||
of the vales and can even casue a rupture. To be sure, place the kit in position to | ||||||||
ensure the assembling will work | ||||||||
4 | Before starting the fittings, ensure the threads and tappings are clean | |||||||
5 | If secton of pipes have not their final support in that place, They can be temporatily | |||||||
fixed, In order to avoid unnecessary strain on the valves | ||||||||
6 | The theoretical lenghts gived by ISO7/1 for the tapping are typically longer than | |||||||
required, The length of the thread should be limited, and check that the end of tube | ||||||||
does not press right up to the head of the thread | ||||||||
7 | For the sealing assembly valves pipes, it is essential to use products that are | |||||||
compatible with the requirements of the clean water meter | ||||||||
8 | Position the pipe clips on both side of the valves | |||||||
9 | If mounting on an air conditioning with Per tubing and hoses, it is is necessary | |||||||
to support the tubes and hoses with the fixed to abvoid strain on valves | ||||||||
10 | When screwing the valves, ensure you only rotate on screws side by the 6 ended | |||||||
side, Use an open ended spanner or an adjustable spanner and not a monkey | ||||||||
wrench. Never use a vice to tighten the fixing of the valves | ||||||||
11 | Do not over tighten the valves, Do not block with any extensions as it may cause a | |||||||
rupture or weekening of the forging strenght. The Torque force not more than 30Nm |
General Guidelings :
1 | Ensure that the valves to be used are appropriate for the condition of the installation | |||||||
2 | Be sure to have enough valve to be able to isolate the section of pipes as well as | |||||||
the approciate equipment for maintenance and repair | ||||||||
3 | Ensure that valves to be installed are of correct strenght to be able to support the | |||||||
capacity of their usage | ||||||||
4 | Installation of all circuits should ensure their function can be automatically tested on | |||||||
a regular basis ( at least two times per year) |
.
Welcome to your inquiry anytime.